

The buildings also have an open-air storage facility with rooftop parking. These buildings have three offices with a locker room and bathrooms, and three maintenance bays with maintenance pits and hoist cranes. The air maintenance building consists of two pre-engineered buildings. The air cargo facility is a pre-engineered building that includes five separate office areas, each having loading/unloading storage areas that accommodate the airlines’ truck deliveries. To speed the superstructure installation, as well as promote safer working conditions, the uppermost control tower steel structure was assembled at the ground elevation and lifted into place in a single tandem crane lift. This exterior finish provides energy efficiency while being much less expensive than stucco or panels.


148 feet tall air traffic control tower.Walbridge was selected as general contractor by the Panama City Airport District for the new 125,000 square foot seven gate terminal building. Northwest Florida-Panama City International Airport Terminal was the first international commercial service airport to open in the United States in more than a decade.
